• Comparative study on two deployment methods for large subsea spools 

      Li, Lin; Zhu, Xinying; Parra, Carlos Andres; Ong, Muk Chen (Peer reviewed; Journal article, 2021-08)
      The demand for subsea spool deployment is increasing with the expansion of offshore projects. For a project to install multiple spools, different deployment methods can be used. The choice of method may influence the safety ...
    • Dynamic Analysis of Splash-zone Crossing Operation for a Subsea Template 

      Amer, Adham M.; Li, Lin; Zhu, Xinying (Peer reviewed; Journal article, 2022)
      Subsea templates are steel structures used to support subsea well components. Normally, offshore crane vessels are employed to install them to the target location on the seabed. Crossing the splash-zone during the lowering ...
    • Numerical analysis and risk analysis of the lifting operation of a subsea template 

      Lervik, Martin Sande (Master thesis, 2022)
      Two different templates, template A and template B, for subsea oil and gas production are studied in this work. Numerical time-domain simulations for the crossing of the splash zone are run in OrcaFlex. Template A has ...
    • Numerical study on the deployment of a subsea template 

      Amer, Adham (Masteroppgave/UIS-TN-IMBM/2020;, Master thesis, 2020-06-30)
      Subsea templates are normally transported to the installation site on the deck of a crane vessel. After being lifted off from the deck, the template is 1) over-boarded from the initial location to the target position by the ...